Key Points

Lua Construction works out the layout and the budget with the homeowner first. Then an architect or a drafter prepares the construction documents, which are quoted separately, and then we pull the permits.
Approved plans that no contractor ever priced can come in at maybe 3 times what the homeowner expected to pay.
Homeowners who already have approved plans get a page-by-page review from Lua Construction, with every open question answered before the fixed-cost proposal.

You hire an architect, get a set of plans, and then find out what it costs to build them. For some homeowners, that number is way over what they planned to spend.

We start with the layout and the budget, before any plans go to an architect.

You’ll learn:

  • What changes when the layout and budget come first
  • Why plans from an architect can come back over budget
  • What happens on the job when plans are missing details
  • Who handles the construction documents and the permits
  • How we work from plans you already have

Should I Hire One Company to Design and Build My Remodel, or an Architect and a Builder Separately?

When you start with us, we do hand-sketched conceptual drawings and layouts first. Then we show you what it would cost, to see how you feel about that.

We’re contractors, not architects. Once the layout and the budget are final, we share the design with an architect, who drafts it and converts it into construction documents, the set of plans the permit needs.

Our conceptual drawings are accurate enough for an architect or a drafter to work from, plus the architect starts from a design that’s already within your budget.


Why Do Plans From an Architect Sometimes Come Back Over Budget?

Some homeowners bring us plans that the city or the county has already approved and that are ready for production, but that no contractor ever priced. Those plans were made without a contractor’s budget to check them against. When we review them, the project can come in at maybe 3 times what the homeowner thought they would pay.

Part of the gap can come from how the cost was estimated. Without a contractor’s numbers, an estimate has to lean on general square-foot costs, like the ones you can find online, and those can miss what the economy, interest rates, and inflation are doing to costs.

One homeowner had an architect lay out 2 bathrooms. When she got our price, it was way over her budget, so we redesigned the space for her budget.

Hand-sketched shower drawing with the bench, niche, and valve heights marked

In place of the architect’s 2 bathrooms, we built one master bath with a walk-in shower with a bench. We hand-sketched that shower with all the dimensions marked, from the bench and the niche to the heights of the valve and the shower head.

With our guidance and recommendations, we made it work. That’s the main reason we start with pre-construction planning and not with an architect.


What Happens During Construction When the Plans Are Missing Details?

Plans don’t always hold all the information our crew needs to build. When a question comes up mid-build and the answer has to come from someone else, our crew can end up on standby, waiting for that information, and the job slows down.

On one kitchen we remodeled, the city kept requesting information, and the plans were missing information we needed, so we were working with the architect while we built. We had to verify a lot in the field once demolition started, and we sent the architect our questions as they came up. A special-order structural beam added to the delay.

This isn’t good for anyone involved. So during design, we check every fixture and plumbing and electrical spec against the actual space, so we aren’t handing you a proposal for something that might not work in your home. That way, when the design goes into construction documents, all of this is already figured out.

Here’s more on what the design phase catches.


Who Handles the Construction Documents and Permits When One Company Runs My Remodel?

Say your remodel changes the layout. Then it needs permitted construction documents, and here’s who does what:

  • We work out the conceptual layouts and the budget with you.
  • Once your design and budget are final, we get you a separate quote for the construction documents.
  • An architect or a drafter prepares the construction documents from the final design.
  • We pull the permits under our license with a complete set of construction documents.

We tell you about that separate quote up front, because construction documents can cost a lot by themselves.

For more on working with the city, read about how remodeling contractors help you navigate permits and regulations.


Can You Build From Plans I Already Have From an Architect?

Maybe you already have approved plans from an architect. You can still bring them to us. Before we price the job, we go through them page by page. We mark every open question on the plans and send those questions to the architect.

We charge a feasibility fee for that review, which tells us whether the plans are ready for our crew to build from. Once the answers are in, we give you a fixed-cost proposal. Getting those answers first cuts down on a lot of change orders, which are changes to the contract after you sign, and on misunderstandings once the work starts.


Ready to Plan Your Remodel With Lua Construction?

Tell us where your remodel stands, whether it’s still an idea or you already have plans from an architect. Fill out our contact form, give us a call, or take a look at our whole-home remodeling and additions page.

Frequently Asked Questions

What if I already have an architect?

If you already have an architect, you can still bring us in. On custom projects, we can also work with an interior designer or an architect on a whole new layout. If your architect is still designing, reach out for a preliminary budget so you get a realistic one. If your plans are already approved, we review them page by page and get every open question answered before we price the job.

Do I need an architect for my remodel?

Whether you need an architect depends on whether your layout changes. A facelift that keeps the same layout, with new cabinets, countertops, and sinks, typically doesn't need a construction permit, so we can finalize our own scope of work and conceptual layout and build from that. A remodel that changes the layout needs permitted construction documents, so once your final design is approved, we send it to an architect or a drafter for construction documents, and we pull the permits.

Are the construction documents and permit fees included in your price?

No, both are separate. Construction documents aren't included in our pre-construction planning, so once your design is final, we get you a separate quote for them. That cost can run from about $2,000 to $30,000, depending on who prepares them and how much they handle. A drafter can cost up to 50% less than a full-service architecture firm. Permit fees are separate too, and we can't mark them up.

Read More From LUA Construction