Key Points

A refresh of floors, paint, and trim costs less than moving walls, which brings structural work and city drawings.
Upgrades the existing house needs, like the electrical panel, sewer, or HVAC, can come with new work, and homeowners often underestimate how much they add.
Finishes add up one choice at a time, and the final price comes from your final design and selections, not from square-foot costs.

Many of our whole-home projects start as a kitchen. Once it’s done, the rest of the house looks dated next to it, and many homeowners decide to keep going. From there, 2 projects that began the same way can land at very different prices.

You’ll learn:

  • Our 3 whole-home remodeling levels and their starting prices
  • Why moving a wall costs more than a facelift project
  • Which costs homeowners tend to underestimate
  • How finish choices add up
  • Why a final price waits until the design and selections are final

What Makes One Whole-Home Remodel Cost More Than Another?

It comes down to how much of your house changes: the more it changes, the more it costs. Each step up means more work and more materials, so the price rises with it.

Say you and a neighbor each call your project a whole-home remodel. You give your house a refresh, while your neighbor opens up walls and adds on. Theirs will cost more than yours.

We think of it in 3 levels:

  • Standard starts at $148,000 and includes:
  • A new finish on all your floors
  • A complete house repaint
  • A simple kitchen and bathroom remodel
  • New trim
  • A new lighting configuration
  • Deluxe starts at $255,000 and includes:
  • Some of the walls reconfigured
  • A kitchen and bathroom remodel
  • The same floor finish, repaint, trim, and lighting as Standard
  • Premium starts at $400,000 and includes:
  • A full reconfiguration of the walls where necessary
  • A full update of your rooms, including the kitchen and bathroom
  • An addition

You can learn more on ourwhole-home pricing page.


Why Does Moving Walls Cost More in a Whole-Home Remodel?

Wall with a pass-through opening into a kitchen, with four wood bar stools lined up below it.

We sort kitchen jobs into 2 kinds: a facelift and what we call structural movement, where the layout changes and walls move. A facelift keeps the same layout, with new cabinets, counters, and sinks, and it typically doesn’t need a construction permit.

Moving a wall costs more than a facelift because it means structural work. The plumbing and electrical around it can need to be relocated or redone as well.

Most of the homes we work in were built in the early 1990s to the early 2000s. In a lot of them, a wall like this one, with a pass-through opening, splits the kitchen from the living area. If the wall carries weight, a beam has to take over its job, and the floor where it stood needs patching.

Opening that wall so the kitchen, dining room, and living room connect is something we do again and again.

When the layout changes, it needs permitted construction documents. Those are the detailed drawings that go throughcity plan review, the first step before a building permit is issued. An architect or drafter prepares them once your design is final, and we give you a separate quote for them. They can run from about $2,000 to $30,000.

Kitchen ceiling with a dropped soffit over light wood cabinets, recessed lights, and a round ceiling light.

The ceiling can add to the work too. Soffits are boxed-in sections that drop down from the ceiling, often over the cabinets. In one kitchen we remodeled, they hung about a foot below the ceiling and made the room feel almost claustrophobic.

The roof was already flat, so there wasn’t much room to raise the ceiling. We worked with the homeowner’s architects on a plan to get the most ceiling height once a wall came out of that kitchen. A custom-engineered beam was part of it, and that’s work a facelift project doesn’t call for.


What Costs Do Homeowners Underestimate in a Whole-Home Remodel?

Homeowners tend to underestimate the existing house upgrades a remodel creates, like the electrical panel, sewer, or HVAC.

New work generally has to meet today’s codes, and the older systems it connects to don’t always measure up. On additions, the list also includes meeting California’sTitle 24 energy code and the structural requirements for earthquakes.

On the flat-roof kitchen with the custom beam, we were running new circuits back to the panel and upgrading some of the electrical. The homeowner had us upgrade the electrical panel as well.


Why Do Finish Choices Add Up So Fast in a Whole-Home Remodel?

White kitchen with an island cooktop, a waterfall counter edge, under-cabinet lighting, and a gray tile floor.

Finish choices add up fast because every finish is a separate decision with its own price. In a kitchen like this one, each of these is a choice:

  • Cabinets
  • Counters
  • Range hood
  • Flooring
  • Under-cabinet lighting

A whole-home remodel carries those choices into more rooms, so the differences add up across the house.

Details in the plans add up too. One set of plans we reviewed asked for:

  • 10-foot ceilings
  • 8-foot doors
  • A smooth stucco exterior
  • A tile roof
  • Tile floors
  • Slab countertops

Doors show how one detail moves the price. Regular doors are 80 inches tall, or 6 feet 8 inches. They are production doors, the kind we can get from a local store at a very low cost. 8-foot doors are custom, special-order doors, and ordering them drives the cost up a lot.


Why Can’t a Remodeler Give Me One Price for a Whole-Home Remodel?

Your final selections and your final design set the cost at the end. That’s why, before we price a whole-home remodel, we plan it with you.

Square-foot costs you can look up online are not a reliable guide, especially while the economy, interest rates, and inflation keep changing.

Our detailed proposal spells out the scope of work, and it comes after you approve your final selections and design.

If your selections add up to more than your budget, we talk that through while we plan, before the proposal and before we’re halfway through the project. Skipping custom cabinets or choosing laminate over tile floors are the kinds of changes we look at to stay inside it.


Ready to Plan Your Whole-Home Remodel With Lua Construction?

Whether you’re starting with a kitchen or planning the whole house, we plan the project with you before we price it. You can read more about ourwhole-home remodeling and home additions service.

Fill out our contact form or give us a call, and we’ll talk through what your project involves.

Frequently Asked Questions

Does a bigger whole-home remodel take longer?

A bigger whole-home remodel generally takes longer. The Standard level takes about 5 to 7 months, and Deluxe takes about 6 to 8 months. Premium, with the addition, takes 7 to 10 months or more. Moving walls and building an addition add structural work and more trades to schedule, which is part of why the time stretches.

Do you mark up permit fees on a whole-home remodel?

We can't mark up permit fees. When your layout changes, permits get submitted to the city. Once the construction documents are complete, we submit the permit under our license and deal with the city directly. The architect or drafter provides the drawings, but they don't go out and obtain the permit, so that part is ours.